Deutz — 05.04.14 Woodward UG8D/UG8L Hydraulic Governor Linkage Setting, S/BV 9 M 628

© 1283 Job Card No.: 05.04.14 Page 12 of 12 Woodward UG8D/UG8L Hydraulic Governor Linkage Setting Engine: S/BV 9 M 628 Filing No.: 0178-29-10 1809 15. Setting the starting fuel limit: While the engine is running at 11 bar b.m.e.p., pressurize air cylinder of fuel limit and adjust refitted lever so that there is contact at point (**) - Fig. 20 - . Tighten screw (*), depressurize air cylinder. After finally completing the settings, refit the covers at points A22, A25, A23 and A26 - Fig. 1 -, together with new gaskets, if necessary. Remount the linkage covers. © 24 940 1 Fig. 20 © 24 940 1 © 24 940 1