Deutz — 05.04.15 Control Linkage

© 0199 Job Card No.: 05.04.15 Page 4 of 5 Control Linkage Engine: S/BV 6/8/9 M 628 Filing No.: 0178-29-10 2004 Renewing Link Bearings of Bearing Block (2) - Fig. 1 - Release link rods C1 and C3 - Fig. 6 - at the levers (5), as described under ”Renewing Link Heads”. Unlock hex. bolts (7) and remove. Take off levers (5) and Woodruff keys (6). Remove Allen-head screws (43), take off bearing block. Care- fully drive out shaft (44) with brass drift and remove link bearings (3). Clean all parts in diesel fuel and rub dry with a non-fraying cloth.

First, push one link bearing onto shaft (44) as far as the stop, after having applied a film of locking com- pound DW 57 to the seat of the inner ring and to the seat of the outer ring. The sliding surfaces of the links must be abso- lutely free of locking compound. Push shaft with link bearing into bearing block. Then fit the second link bearing in similar manner, provi- ded with Deutz DW 57, and push on as far as the stop. When the locking compound has hardened, check shaft for ease of movement. Position the two levers (5) together with the Woodruff keys (6) and push on to butt against the link bearings (3), free of axial play. Screw in hex. bolts (7), tighten and lock with locking plates.

Fasten link rods C1 and C3 to levers (5) as described under ”Renewing Link Heads”. © 50 077 1 Fig. 6 Link bearings of bearing block © 50 077 1 © 50 077 1