© 0199 Control Linkage Job Card No.: 05.04.15 Page 5 of 5 Engine: S/BV 6/8/9 M 628 Filing No.:: 0178-29-10 2004 © 50 073 1 Fig. 7 Reconditioning of the telescopic pieces Reconditioning Telescopic Pieces Dismantle link rod C1 - Fig. 1 - as described under ”Inspecting Telescopic Piece”. Loosen hex. nuts (15) - Fig. 7 - and remove link heads (16) and (10), the latter together with turnbuckle (14). Carefully screw off union nut (4), which is under pressure of compression spring (9) inside the telescope. Take out connecting piece (7) and compression spring (9). Clean all parts in diesel fuel and check for wear and corrosion, renewing any damaged parts.
When re-assembling the telescopic piece (1), fit a new packing ring (6) - wetted completely on the outside with Deutz DW 48 - in the union nut (4). Apply a coating of Deutz S2 to the sliding surfaces between telescopic piece (1) and connection piece (7). Completely coat thread of telescopic piece with Deutz DW 60 for receiving union nut (4). Now insert compression spring (9). Fit union nut over connecting piece (7), screw onto telescopic piece (1), and tighten. Mount the link heads in reverse order as for removal. Check function of telescopic piece as described under ”Inspecting Telescopic Piece”. Check and set the linkage as per Job Card 05.04.14. Lead-seal hex. nuts (15).
Mount linkage as described under ”Inspecting Telescopic Piece”. Upon completion of the work, check control linkage in mounted condition for proper operation. © 50 073 1 © 50 073 1