© 1286 Injection Pump Control Rod Removal / Refitment Job Card No.: 07.02.03 Page 1 of 4 Engine: S/BV 9 M 628 0178-17-10 2055 Filing No.: Removal and reinstallation of the plungers re- Tools: quire removal of the control rod. This can be - Standard tools done with the fuel injection pump mounted, - Deutz DW 59 locking compound (Sec- otherwise remove injection pump as descri- tion 3.6) bed on Job Card 07.04.01. Job Cards: - 07.02.06 - 05.04.14 Job: Removing Control Rod of Pump No. 1 - Fig. 1 - Remove control linkage C1 and connection rod (55) between the pumps No. 1 and No. 2 (job 05.04.14). Remove cover (95) - Fig. 2 - and gasket (94). Then, take down cover (74) with gasket (72).
Open lead-seal wire (205), unscrew hex. bolts (320) and carefully withdraw lever (316) from the two clamping bushes (319). © 25 341 1 Fig. 1 © 25 341 1 © 25 341 1