OPERATION OPERATION LEVELING OPERATIONS 0. NOTICE Always operate the machine in reverse when carrying out leveling operations. If it is necessary to carry out leveling operations when traveling forward, do not set the bucket dumping angle to more than 20 degrees. Turn the E.C.S.S. OFF carrying out leveling operations. 1. Scoop soil into the bucket. Move the machine backward while spreading soil from the bucket little by little. 2. Go over the spread soil with the bucket teeth touching the ground and level the ground by back-dragging. 3. Scoop some more soil into the bucket, put the lift arm in float, level the bucket at ground level, and smooth the ground by moving backward.
PUSHING OPERATION 0. Never set the bucket to the DUMP position when carrying out pushing operation. When carrying out pushing operations, set the bottom of the bucket parallel to the ground surface. LOAD AND CARRY OPERATIONS 0. When carrying a load, lower the bucket to lower the center of gravity when traveling. Always stop the machine and lower the work equip- ment to the ground before operating the E.C.S.S. switch. If E.C.S.S. system is switched on, the work equipment may move. When carrying out inspection and maintenance, first lower the work equipment to the ground, then turn the E.C.S.S. switch OFF before starting the inspection and maintenance operation.
The load and carry method for wheel loaders consists of a cycle of scooping - Always keep the travel path properly maintained. When using the load and carry method, see “PRECAUTIONS WHEN LOAD AND CARRY METHOD ( 3-115 )“. 3-103 CAUTION WARNING