. HIGH ALTITUDE SPECIFICATIONS SERVICE PROCEDURE ADJUSTING PRESSURIZING PRESSURE 4. Operate the dump lever to the RAISE position and raise the dump body slowly. With this operation, the indicator on the pressure gauge will go down. 7 - 5 1. Start the en gine and charge the air 2. Turn knob (1 ) of the pressure reduci ng valve clockwise and set the p ressure to 49 kPa (0.5 kgf/cm2 3. Open pressurizing valve (2) and pr 5. Operate the dump lever to the FLO AT position and lower the dump body pressure ga from the qui slowly. With this oper uge will go up to a point ck relief valve, and the 6. Repeat the the dump b procedure in Steps 4 an ody.
The value indicat d 5 2 to 3 times and seat in ed by the pressure gauge when the du mp body is seated is th e set pressure at that point. 7. Turn knob ( 1) of the pressure red essure. ucing valve to set to the gf/cm2, 11.4 PSI). 7 to adjust the pressure. the specified pr Specified pr essure: 78.4 kPa (0.8 k 8. Repeat the procedure in Steps 4 to 7 to adjust the pressure