eng — EVERY 2000 HOURS SERVICE

. HIGH ALTITUDE SPECIFICATIONS SERVICE PROCEDURE EVERY 2000 HOURS SERVICE the pressurization pressure must be INSTALLING PRESSURE GAUGE REMOVING PRESSURE GAUGE 7 - 4 REPLACE HYDRAULIC TANK PRESSURIZING COMPONENT Ask you r Komatsu distributor to carry out replaceme nt every 2000 hours or every yea r, whichever comes sooner. ADJUSTING PRESSURIZING PRESSURE FOR HYDRAULIC TANK When th e c ompon ent u sed to pressuriz e the hydr aulic tank is adjusted , so ask yo ur Komatsu distributor to carry ou t the adjustment. 1. Stop the engin e and close the pressurizing valve 2.

To a void high pressure fr om being a pplied to t he hydraulic tank , turn the k nob (2 ) of the pressure r educing val ve fully in the clockwis 3. Pull the r ing of drain valve (3) and release the ai r from the air tank 4. Remove essure the p ressure g auge. Use a pressure g auge that can measure 9.8 t o 98 kPa ( 0.1 to 1.0 kg f/cm2, 1.4 t o 14.2 PSI ). 1. Stop the engin e, pull the rin g of drain v alve (1), an d release the air fr om t he air tank. 2. Remove the pr essur e gaug e and insta ll the plug.