SEN02305-01 30 Testing and adjusting Procedure for turning on KOMTRAX terminal When the machine is delivered, KOMTRAX ter- minal is installed: a When the machine is delivered, KOMTRAX terminal is installed (machine with the standard equipment), implement the following proce- dure. 1. Reporting of machine model, model num- ber and serial number Report the machine model, model number and serial number to the person responsible to operation of KOMTRAX. 3) Disconnect the inspecting connector 1 and maintain that state for 5 seconds. 4) Turn ON the starting switch and maintain that state for 5 seconds. 5) Disconnect the inspecting connector 2 and maintain that state for 5 seconds.
6) Connect the inspecting connector 1 again and maintain that state for 5 seconds. 7) Connect the inspecting connector 2 again and maintain that state for 5 seconds. 8) Make sure that the KOMTRAX terminal 7- segment indicator lamp is normally turned on. 2. Registration of KOMTRAX terminal The person responsible to operation of KOMTRAX shall register the subject terminal using the KOMTRAX client PC. a See “KOMTRAX administrator manual” for the procedure. a Above completes the necessary opera- tions. When installing KOMTRAX terminal after the machine is delivered:
a When installing KOMTRAX terminal after the machine is delivered (machine with the retro- spective equipment), implement the following procedure. 1. Station opening inspection a Referencing “Preparation work for trouble- shooting of electrical system”, confirm the position of KOMTRAX terminal and the inspecting connector (the inspecting con- nector is provided at the bottom of KOMTRAX terminal). a Finish the operations of steps 4) to 7) within 30 seconds. 1) Turn OFF the starting switch and then, after making sure 5 seconds have elapsed, proceed to the next step. 2) Make sure visually that the inspecting con- nectors 1 and 2 are connected. q Inspecting connector 1:
G02 (female) and G03 (male) q Inspecting connector 2: G04 (female) and G05 (male) 50 BR380JG-1E0