50 Disassembly and assembly SEN02738-00 17. Press crusher clearance decrease switch (4) on the control box to push out fixing link (7) and adjust the hanging height of the wire simultane- ously. Set the center of the front contact sur- face of the toggle plate to that of the swing jaw seat. 25. Check clearance of discharge setting (A) and adjust it to the desired value. For the method of adjust the clearance of dis- charge setting, see Testing and adjusting, “Testing and adjusting clearance of discharge setting”. 18. Stop the engine. 19. Remove the nylon sling from the toggle plate. 20. Install tension spring (8) and compress it to the specified tightening length.
Set tightening length L of the tension spring to 258 – 260 mm when the crusher outlet clearance is 50 (OSS). 21. Install rubber cover (1 piece) to the top of the toggle plate. 22. Loosen the chain block installed under the swing jaw and remove the wire. 23. Close the crusher inspection hatch and fix it with the bolt. 24. Install the dust prevention rubber plates to the sides (right and left) of the crusher. BR380JG-1E0 9