Kaiyi BR380JG-1E0 — REPLACEMENT PROCEDURE FOR PRIMARY BELT CONVEYOR HEAD PULLEY FRAME

50 Disassembly and assembly SEN02738-00 1) Remove belt cleaner (3). 2) Set blocks [1] between head pulley (4) and guard (5) on both sides of the head pulley. 6. Fix the head pulley with a V-block and wooden block as shown below so that it will not be mis- aligned with the frame. 3) Support the head pulley with jack [2]. (A) Insert wooden block to fix pulley. (B) Fix head pulley assembly with V-block to prevent misalignment. (C) Adjust height with jack. 5. Disconnect conveyor motor hoses (2) from the body. a After removing the hoses, put dummy plugs to their ends and motor ports.

q Size 03 (Flat face-to-face O-ring seal) ..1 set q Size 04 (Flat face-to-face O-ring seal) ..2 sets BR380JG-1E0 23