Data East DX-1 — Data East DX-1 Multi Conversion Kit Installation Instructions Manual PDF

POWER SUPPLY The location of the above with respect INSTALLATION power supply was to length of the considered the power ca- ble; however, consideration must be given to proper ventilation of the power supply. Proper access of the power supply should also be considered so that voltage measurements may be made and adjusted according to the power supply specifications. POWER Be SUPPLY sure that CONNECTION proper fuse protection has been provided for the power supplies and thoroughly review the primary wiring circuit. If necessary, cut the cable ties so that you may trace each wire to assure that it is properly connected.

NOTE POWER SUPPLIES GENERATE HEAT DURING OPERATION AND MANY NEED TO BE DE-RATED AT HIGHER TEMPFRATURFS. REVIEW YOUR POWER SUPPLY SPECIFICATIONS AND IF THERE IS ANY DOUBT RUN TEMPERATURE TESTS PRIOR TO PLACING EQUIPMENT ON LOCATION. CUSTOMER-PROVIDED POWER SUPPLY SYSTEM. After determining that the power supply you intend to use has sufficient capacity, use a voltmeter to assure you have required output Refer to the properly voltages. CABLES identified all section--Cable H for color code and pin required connections.

numbers Connect ends Supply-to-Card of Cable) Cable to your H (Power power supply, the 10) using the connector cable cable is into the Card connector is taking in that each is of Insert the the other Rack Motherboard Make seated and such a way vibration or equipment motion.(ie across a sharp piece of that metal it each end (BUS sure that future staples) routed Rack care provided. properly (V-200240-1) by damaged not the the of each of the the unterminated connection is proper and that CORRECT VOLTAGE AND POLARITY. of of that the could or steel be