Downloaded from https://www.everyspec.com MIL-HDBK-502: A MIL-HDBK-502: A CQUISITION CQUISITION L OGISTICS OGISTICS to determine if or when there has been an increase in scope, and effective negotiations on cost and schedule will be impaired, if not rendered impossible. Statement of Objectives (SOO) The statement of objectives (currently being used by the Air Force) states basic, top-level objectives of an acquisition and is provided in an request for proposal (RFP) in lieu of a government-written statement of work. It allows potential offerors to develop cost-effective solutions and gives them the opportunity to propose innovative alternatives to meeting the stated objectives.
A statement of objectives is required for all Air Force weapon systems acquisition contracts and is strongly encouraged for modifications to existing weapon system acquisition contracts. The program manager approves SOOs. The statement of objectives should be compatible with the mission need statement, operational requirement document, program management directive, acquisition strategy panel guidance, technical requirements documents or specifications, and the preliminary contract work breakdown structure. The statement of objectives should address product-oriented goals rather than performance-oriented requirements. It should not be longer than four pages (as a goal).
The SOO is typically appended to Part L of the RFP (Instructions, Conditions and Notices to Offerors). It does not become part of the contract. The offerors use the statement of objectives to develop a statement of work, final contract work breakdown structure, integrated master plan, integrated master schedule, and other documents required by the RFP. Section L should include instructions that require all offerors to address all aspects of the statement of objectives in their proposals. What is the program impact of the use of SOOs? Program offices will no longer be required to create statements of work.
Any specific tasking the contractor must accomplish in the performance of the contract that is not elsewhere in the RFP should be included in section L. 8.4.4 Section D: Packaging and Marking Section D sets forth the packaging and marking needs for deliverable items. Inputs are prepared according to DoD packaging and marking policies and are cross-referenced to Section B CLINs. The transportation, handling, and marking needs of warranted items must be identified. Consider requiring the contractor to provide a notice of warranty with the item(s) on the outside of the container, inside the container, and on the equipment item. The notice should include: A statement that a warranty exists. 8-9