Delta DVP-ES3 — 6.26.2 Explanation of High-speed Output Instructions

DVP-ES3 Series Programming Manual Case 1: when the mark alignment occurs in the ramp-down section  Green line: signal of mark aligment  Blue line: the actual output speed The operation of the mark alignment (green line: OFF -> ON) begins when the number of pulses is 95,000. Set S 6 = 15,000; the output stops after 15,000 pulses at the current speed. Case 2: when the mark alignment occurs in the ramp-down section  Green line: signal of mark aligment  Blue line: the actual output speed _6 The operation of the mark alignment (green line: OFF -> ON) begins when the number of pulses is 95,000. After the mark alignment, set S 6 to -1, the output stops immediately. 6-818