Tests to be performed: To check the wiring (with the door open), measure the following wiring connectors (fig. 4) : - between wires J1-3 and J1-1, the circuit must NOT be open (measure the resistive value of the PTC). - between wires J1-3 and J1-2, the circuit must be OPEN. NO YES Replace the door latch or the door. Replace the circuit board and restart the diagnostic cycle to check for further alarm conditions. If there are traces of burning on the circuit board, refer to page 59 2007-10 SOI/DT-mdm FCPD-dp Quality-fz 32/59 599 70 32-47 E42: Problems with door aperture E42 E42 Maximum time exceeded (255 seconds) Detach the connectors and effect measurement on the component (fig. 9):
- across connectors 3 and 5 the circuit must not be open (the resistive value should be measurable). - across connectors 4 and 5, the circuit must be open (the numbers are printed on the component). Is the door safety interlock OK? YES Check/replace the wiring and restart the diagnostic cycle to check for further alarm conditions. O Replace the door interlock and restart the diagnostic cycle to check for further alarm conditions. N O Is the door locking device securely anchored to the latch? NO YES Replace the door locking device. Does the appliance function correctly? YES Restart the diagnostic cycle to check for further alarm conditions. J7 J10 J9 J2 J1 U3 Fig.4 Circuit board fig. 9 fig.
9 J10 J9