sinee — 10.1 Routine Maintenance and Inspection of inverter

EM500 Open-Loop Vector Control Inverter User Manual Table 10-1 Items for Routine Check In order to make inverter operate normally, regular maintenance and change must be performed for purpose of the service life of the inner components of inverter. The service lives of inverter components vary with the service environment and conditions. In Table 10-2, the replacement terms of the components of the inverter are for user reference. Table 10-2 Replacement Terms of the Components of inverter In the table above, the replacement terms are based upon service conditions for the components of inverter below: Ambient temperature: annual average 30 ℃ . Load factor: below 80%. Running time:

Below 12 hours per day. 370 Items Inspection content Countermeasures Screws of main circuit terminal and control circuit terminal. Whether the screws are loosened. Tighten the screws with a screwdriver. Cooling fin Whether there is dust or foreign object. Clean up dust and foreign objects with dry-compressed air of 4-6kg/cm2 pressure. PCB Cooling fan Whether there is abnormal sound or vibration. Whether the accumulated running time has reached to 20,000 hours. Replace the cooling fan. Power module Whether there is dust. Clean up dust and foreign objects with dry-compressed air of 4-6 kg/cm2 pressure. Electrolytic Capacitor If there are phenomena of changing color, foreign odor and blister.

Replace the electrolytic capacitor. Component Standard replacement years Cooling fan 2 – 3 years Electrolytic capacitor 4 – 5 years PCB (Printed circuit board) 5 – 8 years