sinee — 5.2.2 Confirm Power-on Status

EM600 High-Performance Vector Control Inverter User Manual 1. It’s strongly recommended to execute keypad operation if terminal or communication control is applied. 2. Inverter can be used normally only after it has passed the idle trial operation and the full-load trial operation. 5.2 Attentions for Trial Operation 5.2.1 Turn on the Power Switch Before turning on power switch, please confirm the following items:  Correct power voltage: 3-phase AC380 - 415V, 50Hz; 3-phase AC660 - 690V, 50Hz  Input power cable is connected to inverter’s output terminals R, S and T.  Inverter’s output terminals U, V and U are connected to motor’s input terminals.

 Control circuit terminals are correctly connected to the control devices and terminals are disconnected.  Load motor is idle.  Turn on power switch when settings above are correct.  、 are output ends of inverter’s DC bus voltage; represents protective grounding terminal and PB represents cable end of braking resistor. Damages of inverter caused by incorrect wiring of them are not covered in the warranty. 5.2.2 Confirm Power-on Status If inverter works normally after power-on, keypad will display inverter’s present status code and parameters. In case of other abnormal display phenomena, see Chapter 9 Troubleshooting.  Running status observation: 1.

Check whether load runs at a correct direction. 2. At low-speed running, increase set frequency only when load machine stabilizes. 3. Change input frequency or rotational speed and observe whether motor has any vibration or noise. 4. During operation, observe parameters of monitoring code F18.06 and confirm whether inverter output current is normal. 55 Step Description Input DC current to motor before start or stop, in order to generate the braking torque and thus rapidly stop the rotating motor. DC Braking Special With multiple multi-function input and output ports, EM600 can offer various kinds of application solutions when in use with external controller. Terminal Control