Downloaded from https://www.everyspec.com At" 7M-1g7 - 1.00 A'? . 1(y m X . 10-2 0.95 ~m/S10.1 >.0.90 E 0.85 CD 0.80 xmx1.0 1 2 3 4 5 Number of Paths fl William H. Von Alver,, Ed., Reliability Enginpering 0 1964 by ARINC Research Corporation. Reprinted by perm.-ion of Prentice-Hall, Inc., Englewood Cliffs, N.J. FIGURE 9-8. Mission Reliability for n Redundant Paths, Case 13, when R, Wt= 0.80 h, = 0.223) X 5 1X = 0.001 (Ref. 2). 9-9.1 PERIODIC MAINTENANCE (Ref. 2) 100 x toCase 14. The following procedure will be A,/X 1 0assumed: 0 95 x 103 yx10 1(1) Periodi( maintA'nance is perform(,( C2 every T hours starting at time 0.
12) Ever% =1 0 90 element is checked, and any ono which has failed is replaced by a like-new and /1 7 satisticall identical component. ~ 085Maintenance is perfect in that 0 repaired /repla ed units are good-as-new, no 080 damage is done to the rest or I te system, and 080 the repaire-l system is good-as-new. In ihort. every T hours the system is; restored to 0 7 like-new. 2 j4 Defii_..~ where FIGURE 9-9 Mission Reliability torn fi-dundant r time ;ince( latest i nuimbr J I Paths, Case 13, when R I (t) =0. 80 IT 0 223) repair X, A 0 00 (Ref 2) 0. 1. 2 . . .repair iitinh l -I 91