SPECIFIC INFORMATION AND INSTRUCTIONS 5-19 E URO C ARGO E URO 4 - 5 Figure 5.8 The EM control unit allows the PTO activation and deactivation conditions to be set. The connections on ST60, ST62 and ST63 must be carried out by the bodybuilder so as to activate and display on IC the activation of the PTO. The predefined set conditions for EuroCargo Euro 4-5 are: 116699 5.7.1 Connections Table 5.14 - PTO mode request: ST13 PTO 2 pin 19 To carry out the request, close the pins on the earth of pin 17. Table 5.15 - PTO IN/OUT:
ST60 PTO1, ST62 PTO2, ST63 PTO3 pin 1 PTO feed-back pin 2 PTO actuator (solenoid valve control) pin 3 PTO enabling pin 4 Earth EM (Expansion Module) Print 603.93.431 Base - July 2006 Revi - June 2007 PTO 1 pin 18 PTO 3 pin 20