Downloaded from https://www.everyspec.com MIL-HDBK-816 NOTICE 1 5.1.12.2 Transfer of characterization data to ERRIC. To make as much radiation response data as possible available to U.S. users, the Defense Threat Reduction Agency (DTRA) supports a data bank for such data at the ERRIC operated by the Defense Threat Reduction Information Analysis Center (DTRIAC). The collection is stored in a Visual FoxPro database to allow more versatile and user-friendly queries. It is on-line, using Windows NT as its operating system, along with FoxWeb as its interface via the Netscape commerce server. The URL is: http://erric.dasiac.com.
ERRIC is actively collecting data from other data banks and is very much interested in receiving any new data that is taken. It is strongly recommended here, therefore, that the characterization data which is obtained and documented in the characterization report also be sent to ERRIC. ERRIC is equipped to acquire data from computer disks as well as in printed form. The address and telephone number for ERRIC are: ERRIC The Defense Threat Reduction Information Analysis Center ITT Industries, Advanced Engineering and Sciences Division 2560 Huntington Avenue Alexandria, VA 22303-1410 (703) 329-3872 5.2 Calculation of electrical parameter end-point limits.
The previous sections of this report have described how radiation response characterization measurements should be made so they can be used for defining lot acceptance tests that will provide hardness assurance in future procurement. At this point the assumption is made therefore that the characterization results have been obtained and the discussion turns to the procedures by which lot acceptance tests should be defined. The basic goals here are to select the sample size and to calculate post irradiation test criteria from the characterization data such that future radiation lot acceptance tests performed against these criteria will meet a selected objective.
Typically, the selected objective will be a desired lot acceptance probability and confidence level. It is worth noting that the methods described here are not limited just to radiation hardness assurance but can be used for the more general problem of calculating end-point limits to meet a selected lot acceptance objective. They may be of use, therefore, to any manufacturer of parts who is interested in quantifying the lot acceptance results he can expect as a function of the end-point limit or specification value he selects for a given parameter. 5.2.1 Lot acceptance tests.
Lot acceptance tests are based on testing a sample of parts after they have been irradiated and determining whether the sample of parts passes or fails some specified criterion. If a variables test is being used then the measured mean value and standard deviation of the post-irradiation parameter values will be compared to the specified criteria to determine whether the test passed or failed. If an attribute test (such as a sample size series test) is being used, then specified RHEPL and, possibly, functionality, will be used for determining whether each part, individually, has passed or failed the test. Changes or “deltas” in a parameter may also be used as a RHEPL.
5.2.1.1 Attribute lot acceptance tests in military standard procurement. Because military standard procurement rely almost exclusively on attribute tests, the discussion here mostly addresses this type of test. It should be recognized, however, that, for the same number of samples tested, radiation lot acceptance tests based on variables measurements will usually give higher quality results. Their principal disadvantages are that they are somewhat more complex and costly and require assumptions about the probability distribution to which the parts belong.
Attribute tests such as the sample size series tests used in the MIL-STD system have the advantages that they require less documentation of test results, do not require as much training for test personnel, and do not depend strongly on assumptions about the probability distributions to which the tested parts belong. The relative merits of these two types of tests were discussed in some detail in the forward. 5.2.1.2 End-point limits for sample size series tests. Figure 4 shows the steps to be taken for calculating end-point limits for sample size series lot acceptance tests. Table XI lists these steps in finer detail as a step-by-step check off procedure.
SUPERSEDES PAGE 25 OF MIL-HDBK-816 25