U.S. Department of Defense MIL-HDBK-704-3 — NOT MEASUREMENT

Downloaded from https://www.everyspec.com MIL-HDBK-704-3 3. Apparatus. The test equipment should be as follows: a. Adjustable AC power supply b. True RMS voltmeter c. Frequency counter 4. Test setup. Configure the test setup as shown in figure TAC401-1. Measurements, except current, must be made within 10 cm of the input power terminals of the UUT. 5. Compliance test. With the power source off, install the UUT and the stimulation and monitoring equipment into the test setup of figure1. Turn on the power source and adjust the voltage to the nominal steady state voltage of 115 Vrms (line-to-neutral) and adjust the frequency to the nominal steady state frequency of 400 Hz. Energize the UUT.

Allow sufficient time for the UUT to warm up. Conduct a performance test of the UUT according to the utilization equipment performance test procedures to verify that the UUT is providing specified performance for normal aircraft electrical conditions. For each test condition A through H noted in table TAC401-II, the UUT must remain for a length of time that confirms the utilization equipment can perform as specified at the emergency steady state voltage and frequency limits and should be, not less than thirty (30) minutes.

At each test condition conduct a performance test of the UUT according to the utilization equipment performance test procedures to verify that the UUT is providing specified performance for emergency aircraft electrical conditions. Adjust the voltage to the nominal steady state voltage of 115 Vrms and adjust the frequency to the nominal steady state frequency of 400 Hz. Conduct a performance test of the UUT according to the utilization equipment performance test procedures to confirm that the UUT has automatically returned to the performance specified for normal aircraft electrical conditions, and has not suffered damage.

Record the voltages, frequency, time duration at test condition, and the performance of the UUT for each test condition in the data sheet shown in table TAC401-III. Repeat for each mode of operation of the UUT. TABLE TAC401-II. Test conditions for emergency steady state limits for voltage and frequency. 102 Test Condition Voltage Frequency A Nominal Voltage ELSS Frequency B Nominal Voltage EHSS Frequency C ELSS Voltage Nominal Frequency D ELSS Voltage ELSS Frequency E ELSS Voltage EHSS Frequency F EHSS Voltage Nominal Frequency G EHSS Voltage ELSS Frequency H EHSS Voltage EHSS Frequency