Downloaded from https://www.everyspec.com MIL-HDBK-704-3 5. Compliance test. With the power source off, install the UUT and the stimulation and monitoring equipment into the test setup of figure TAC601-1. Turn on the power source and adjust the voltage to the nominal steady state voltage of 115 Vrms (line-to-neutral) and adjust the frequency to the nominal steady state frequency of 400 Hz. Energize the UUT. Allow sufficient time for the UUT to warm up. Conduct a performance test of the UUT according to the utilization equipment performance test procedures to verify that the UUT is providing specified performance for normal aircraft electrical conditions.
For each test condition A through D noted in table TAC601-II, perform a three phase power failure (0 V) of the duration listed. The voltage must decrease from the steady state voltage to 0 Volts within Ѕ cycle (1.25 milliseconds), remain at 0 Volts for the duration listed for the test condition, and return from 0 Volts to the steady state voltage within Ѕ cycle (1.25 milliseconds). For each test condition, monitor the performance of the UUT according to the utilization equipment performance test procedures for power failure operation to verify that the UUT is providing specified performance for power failure aircraft electrical conditions.
After the power returns to normal limits, conduct a performance test of the UUT according to the utilization equipment performance test procedures to confirm that the UUT has automatically returned to the performance specified for normal aircraft electrical conditions, and has not suffered damage. Record the steady state voltages, steady state frequency, time duration of power failure, and the performance of the UUT for each test condition in the data sheet shown in table TAC601-III. Repeat each test condition 5 times. Repeat for each mode of operation of the UUT.
After all test conditions are complete, adjust the voltage to the nominal steady state voltage of 115 Vrms (line-to-neutral) and adjust the frequency to the nominal steady state frequency of 400 Hz. Conduct a performance test of the UUT according to the utilization equipment performance test procedures to confirm that the UUT has not suffered damage and is providing specified performance for normal aircraft electrical conditions. TABLE TAC601-II. Test conditions for three phase power failures. 108 Test Condition Duration of Power Failure A 100 msec B 500 msec C 3 seconds D 7 seconds