Downloaded from https://www.everyspec.com MIL-HDBK-704-3 4. Test setup. Configure the test setup as shown in figure TAC602-1. Measurements, except current, must be made within 10 cm of the input power terminals of the UUT. 5. Compliance test. With the power source off, install the UUT and the stimulation and monitoring equipment into the test setup of figure TAC602-1. Turn on the power source and adjust the voltage to the nominal steady state voltage of 115 Vrms (line-to-neutral) and adjust the frequency to the nominal steady state frequency of 400 Hz. Energize the UUT. Allow sufficient time for the UUT to warm up.
Conduct a performance test of the UUT according to the utilization equipment performance test procedures to verify that the UUT is providing specified performance for normal aircraft electrical conditions. For each test condition A through J noted in table TAC062-II, perform a power failure (0 V) on the phase(s) noted and of the duration listed. The voltage must decrease from the steady state voltage to 0 Volts within Ѕ cycle (1.25 milliseconds), remain at 0 Volts for the duration listed for the test condition, and return from 0 Volts to the steady state voltage within Ѕ cycle (1.25 milliseconds).
For each test condition, monitor the performance of the UUT according to the utilization equipment performance test procedures for power failure operation to verify that the UUT is providing specified performance for power failure aircraft electrical conditions. For the indefinite time duration, the utilization equipment must maintain specified performance for a length of time that confirms the utilization equipment can continuously operate at the steady state voltage and frequency limits and should be not less than thirty (30) minutes for each of the test conditions.
After the power returns to normal limits, conduct a performance test of the UUT according to the utilization equipment performance test procedures to confirm that the UUT has automatically returned to the performance specified for normal aircraft electrical conditions, and has not suffered damage. Record the steady state voltages, steady state frequency, time duration of power failure, and the performance of the UUT for each test condition in the data sheet shown in table TAC602-III. Repeat test conditions A, B, C, G, and H 5 times. Test conditions D, E, F, I, and J are required to be performed once each. Repeat for each mode of operation of the UUT.
After all test conditions are complete, adjust the voltage to the nominal steady state voltage of 115 Vrms (line-to-neutral) and adjust the frequency to the nominal steady state frequency of 400 Hz. Conduct a performance test of the UUT according to the utilization equipment performance test procedures to confirm that the UUT has not suffered damage and is providing specified performance for normal aircraft electrical conditions. 112