Downloaded from https://www.everyspec.com MIL-HDBK-704-3 METHOD TAC101 Load Measurements POWER GROUP: Three Phase, 400 Hz, 115 V AIRCRAFT ELECTRICAL OPERATING CONDITION: Normal PARAMETER: Load Measurements 1. Scope. 1.1 Purpose. This test is used to verify that three phase, 115 Volt, 400 Hz power utilization equipment utilizes only 115 Volt line-to-neutral power, current inrush is within limits, has balanced power, the power factor is within limits, and does not use half-wave rectification for the applicable edition(s) of MIL-STD-704.
Additionally, when the utilization equipment performance specification document imposes current waveform requirements, this test procedure is used to verify that the utilization equipment current waveform is within total current distortion and current spectrum (current distortion vs. frequency) limits defined in the utilization equipment performance specification document. 2. Validation criteria.
The utilization equipment is considered to have passed if the utilization equipment utilize only 115 Volt line-to-neutral power, is within current inrush limits, is within the balanced load limits, is within the power factor limits, and does not use half-wave rectification for the applicable edition(s) of MIL-STD-704 and as noted in table TAC101-I. If required by the utilization equipment performance specification document, the utilization equipment current waveform must be within the total current distortion and current spectrum limits defined in the utilization equipment performance specification document. The utilization equipment must not suffer damage or cause an unsafe condition. 5