Downloaded from https://www.everyspec.com FM 1-509 After relieving the hydraulic system pressure, check the preload pressure by operating a hydraulically actuated unit. Most accumulators installed in Army aircraft are equipped with air-pressure gages. If they are not so equipped, a high-pressure air gage may be installed at the air preload fitting. The required pressure is stated in the maintenance manual for each aircraft. The air preload must be completely exhausted before disassembling any accumulator. To do this, loosen the swivel nut on the air filler valve until all air is out; then remove the valve. Overhaul or repair of accumulators is not an aviation unit maintenance function.

Some aviation intermediate maintenance units may have this responsibility, but it is primarily a depot maintenance function. 7-8