everyspec.com MIL-HDBK-lool/2 — everyspec.com MIL-HDBK-lool/2: Military Handbook for Materials and Building Components (PDF Download)

Downloaded from https://www.everyspec.com MIL-Hr)BK--lool/2 Section 2: GENERAL CRITERIA 2.1 Approach. Major factors affecting materials selection include life cycle costs, appearance, and performance characteristics of the product. Projected life span of the building, flegibility and expansion requirements, availability of the material, and the energy impact of the product must be considered. A minimum number of different materials should be used to minimize labor costs and to create a unified building appearance. 2.2 Product Appearance. 2.2.1 m. Products must reprasent current proven design standarda and proven state-of-the-art technologies.

Materials should require a minimum of applied finishes. Products with highly decorative or simulated finishes can aPPear substandard and should not be used. 2.2.2 Context While it is not the intent to copy or repeat materiala and components~~ting adjacent buildings, products selected for new buildings must be compatible with existing structures. Base Exterior Architectural Plans (BEAP) should be reviewed for applicable criteria-establishing materials selection and used for a specific base. 2.2.3 Restoration. Restoration work in historic or architecturally significant buildings of any age requires careful product selection.

Components and materials must provide a quality, aesthetic, and durable environment that responds to updated engineering technologies while not altering the basic architectural character and design integrity of the building. G I 2.3 Product Performance. Products must ba strong and durable, not easily marred, discolored, or vandalized, and capable of withstanding regular cleaning. Factory-finished products or materials requiring only an initial finiah applicat ion are desirable. Materials requiring new finishes or frequent replacement should be avoided.

The variety of materials and finishes should be limited to minimize the number and types of different cleaning equiptient and processes required. 2.4 ~. Products must be economical and cost-effective. A minimum initial cost is always desirable, but life cycle costs must be considered. Materials with low initial costs that require frequent maintenance, care, cleaning, and replacement will not prove to be cost-effective in the long term. 2.5 Typas of Construction. The projected life span of a building helps determine the durability and detailing requirements of materials and components. 2.5.1 Permanent Construction.

Buildings and facilities designed and const&cted to serve a specific purpose over a life expectancy of more than 25 years should be energy efficient and fire resistive or noncombustible. finiahes, Select materials, and systems for low maintenance and life cycle costs based on 25 years. G 2