NAVFACENGCOM MIL-HDBK-1001/l — NAVFACENGCOM MIL-HDBK-1001/l: Руководство по архитектурным требованиям и принципам проектирования

Downloaded from https://www.everyspec.com MIL-HDEK-1001/l by better illumination from task lighting. Recent development in fluorescent and other forms of lighting provide effective and economical alternatives to incandescent lighting. 4.3.6 Miscellaneous Means Energy conservation can be enhanced by other measures. In some climates , mass heat storage areas can be effective means of reducing heating loads by capturing excess solar heat gain during the day and I radiating the captured heat at night. Natural ventilation, berms , and planting are other measures to consider. fl.4 Trarisuortability and Availability.

Design and select building components, systems, and materials to ensure, as much as possible, that their ~ transportability to the project site can be easily accomplished. Dimensional limitations of length, width, height, and weight of materials must be considered to permit generally unrestricted worldwide movement. Other factors, such as handling volatile or dangerous materials and the need for temperature or humidity control for the materials , will affect transportability measures. OPNAVINST 4600.22, DOD Engineering for Transportability, describes standard DOD criteria and physical limitations for materials transportability.

This publication also prescribes procedures necessary to obtain transportability reviews and variances when any materials under design, development, or procurement exceed the established criteria and limits. Another important consideration is availability and lead time requirements for materials, furnishings , and equipment. In certain instances, it may be necessary to separately identify long lead time items for preconstruction procurement. o I lb.5 Acoustics Facilities shall be designed for appropriate noise suppression from equipment and shall provide the proper degree of security as required. Refer to DM-3.

10, Noise and Vibration Control for Mechanical Eauiument (will be superseded by U.S Army Technical Manual TM 5.805-4, - and Vibration Control) for criteria and guidance. 4.6 Proiect Cost. It is imperative. that projected construction costs be closely monitored throughout the project. The completed design must ensure as far as practicable that competitive bids will be within the proposed budgets. Any deviations from budget must be addressed as early as possible. 4.7 Value Engineering. Value Engineering (VE) is an organized program which seeks to ensure that a project Is required functions are met at the lowest reasonable cost, consistent with performance , reliability, and maintainability.

VE provides a method to attain a balance between first costs and follow-on life cycle costs. Independent VE studies are required for major military appropriation projects typically at the 35 percent design phase and/or during the preliminary design phase. 10 .]