U.S. Army Material Command (AMC) AMCP 706-210 — FUZES - Engineering Design Handbook AMCP 706-210 (U.S. Army) PDF Download

Downloaded from https://www.everyspec.com 'AMCP 7M6210, Sten-footwir,1= 120 inS 6 n-,S,03tn- b ~(13-7) and ,F-=817 lb;jtien .F, 1.2 lib. / 13-3 SEA MINES where-IL -4 the coe ffici~rit of- friction.,andI y is the def'lection, necessa ry-fqr the parts to separate. 'Sea mines are. expibsive devices~placed, irnthe The- -following design criteria are, evidpt: path of vessels to impede thei porss. The in- (1)fo a enitme rip'wreth reuiedtrip 'herqnt-strengtil .of-. a, ship requires that sea inines 'forceshfou14 not be-.great, hence (2) thie fingers 'contain, large explosive charges, usually -HBX, or should niot be -too stiff 'yet should, return to, the TNT.

They are actuated When touched or closely closcd position quickly sohsf~ oegg he approiached by a ship; Since co6ncealmient; in, wat'er shouideron~t he-firing-stroke., isreiitivej. ead'y, size- is not necessarilY, limhited To. d&sigiiv a devicesimilar, to that in 'Fig. 13-2j, soj-hit generally there is abundant space-for the Ahe designer fiiight_ stait with, steel, -fingers one fuze-mechainisnms. ii'chlong.

The cross setion of -the finciers must All-naval' underwater'miiines fall within one or be a quadrant of a ring so that- its second momemnt the, other of two broad classes, independent or oCarea is controlled.G Oce planited and armed, indepehdent (1~\ 8 4 - ~) 2 mines are actuated automatically by the--pr0esence-I 4,;) - of a ship, In contra't, conitrolledmines trnmit A=~~Ti~h~~J~r2 dur-r)(38 nlelectrical sig 1 alto awshore statioL When a ship 2 1 passes. Personnel st-the shore station may either where r and r-,are 'the infier and outer, radii, anee~6sreth inlo ny deoaete rtpciely. If 'r- 0.36 in. and r, 0.10 in., mine -by a -return 'signal.

This, broad system of 'A 20 x~106 in Th raialinteferncebe- classifying miths is cut across -by three otherj tween fingers and'trip-,plunger can'be 0:065'in.. classification, mrethods, nameply:, (1)' method of 'From 'Eq. 13-7 withlO -= 300',, the plfocon planting (by minelayer, submarine, or 'aircraft), the trio wire'-must be 8 lb t~o release the firing ,(2) position -after, plantinj'(bo ttom, nioored. or pi1*n. th rpwrei e ti teiftin)g),,!and (3) b - type, of firing mechanism ., d~ice'i -The fiing me'hanism carf'be activated by con- cocked, the firing pi~pigis compressed two :tact (electroclidmical,gavnormcnil inches.

In this condition-thefingers.,will -not be ato)rbynfucnce (antcaosio forced apart(Ft. 7.6 lb) and thi'body shoulder Pressure action). will continue to restric thi cntie' cin Safet is, provided in a number 'of- Ways. Sur- Onily after the spring. has, been compressed'ar fct-i''iesisalyhv soluble washer thdt- other 0.30 iny. 'can the increased section jiass the prevents arming until the washer has been dis- body shoulder. Since the spring-, force now ex-! solved- by sea water (see par. 8-8). Aircraft laid ceeds the 8-lb release requirem Ient, the fingers can, Mines employ an arming wire. just like bombs. " open to rehease the fliig pin.

Suibmarine mines have-a positive lock safety bar To'dterinethesenitiity ofthedevce o ~ which falls :free when the mine is ejectLd from a Toping- fore the f61iiv seaatn the detonato the A ii~~~ed~ loi- qainmyb torpedo tube. Detonator safety is provided by u~ed hydros Itatic extender mechanism is a conm'momi de- F1 S-.S 21S, +'S, / \?Vice for Moving the detonator close to the- F,. - (13-9) 'booster charge. Many ines'also have a timing - .~,) 4 ' / echanism to delay arming for a preset time wer F e prng ore~t-elese Sis after planting. This 'same timer can oalsosrea wher is the then- oso, servedeS ash di'stance the spring must be compressed.

from theL __________ cocked position t6 release the firin~g pin, I is'the St- ---- s-------- Ft trip wire length, -anid S t is the distance from the fuze to the tri*p force. This 'is il'ustrated on Fig. 4 13-4. If the tripping force -occurs at the centerof a Figure 13-4. TripWire Action 13;4