7 - - Downloaded from https://www.everyspec.com - -AMCP-706-210 RUZETESTING 151 GENERAL that-lacks, one or more components-of the entire fuzeis 6ften constructedfor devel(opmenttest- Throughout the develbpment of a-fuze, the de- ing.. Sometime;a , special component is substi- signer submitseach component to development tiited for the purpose of, failitatingthe, test of-a test& to ansWer.the question: Does-this, compo- particular fuze function-0r action, To test- a Irm- nient act-in-the aiinaner for-.whichit is designed? ing distance, for example,, the designer may.

, re- When the prototype of the fuze is built, tit is sub- place the- explosive, train by-a flash ch*argethat jected' to Perfornancezor proof:-tests in' order-to -ignites when the arming-process is completed. In answer the question: Does this fuze satisfyt it; acceptanceltests, on the other hand, the fuze can- quirements ?- Since ,these-tests, often destroy the, notbe so modified;H -re; the ,fuze-is-prosuifeto i f.ze-aid-since the available number of'fuzes is have armed whenAt functions at the target. A 'limited, it i s necessary t apply, speciar'methods separate acceptance test,is requiredto check the of analysis to-the test data.

There-is a defifite safe arning distance trend "tbow&d standardization so that-special'at- (2), Development tests, are often more pre- tention is given tostandard tests-(see Table 15!5 cise or-more severe than acceptancetests. Rather in-pa. 15-5). There are,-however, many-estab- than stop at the required limit, the designer pre- lished procedures- that aih serve in', the ,absence fers-to test a given part until it is destroyed so as of a-standard(se6 JouraLarticles, Appendix II); to' acquire useful design dat For example most fuzes are accepted if they withstand 1750*jolts 15-2 PERFORMANCE TESTS in eadhWof three-positions on a-standard machine.

However, the designer -nay 1rofit frbm the knowl- Fuzes are tested in various ways -to determine edge that his fuze withstood-5 times that number whether-they operate as intended, -whether.they of jolts. As another example, in the arming test are safe, and whether, they withstand different mentioned-above, a flash charge permits the de- environments. Performance -tests -include- both signer to locate the distance at which the fuze be- those concerned with operation of the complete came armed, not merely, to determine that it fuze and of the individual components. Common armed within a certain zone.

These examples -or-standard-tests aredescribed-and - yicallabora- -show how-a test- can indicate:the marginal-point, tory -programs for testing-fuzes during develop- i.e. the point where engineering judgment can -ment phase or acceptance phase of the fuze de- be effective in specifying further refinement. sign are suggested: It is necessary to include test - (3) Development tests are specified by the programming in the initial planning for a fuze *designer; acceptance tests, on the other hand, are development project. specified by a Service Board; This arrangement permits an evaluation by 'an independent engi- 15-2.1 DEVELOPMENT AND ACCEPTANCE TESTS neering agency.

The designer will always test the complete fuze to ascertain that the modifications Development tests are performed to evaluate he ,has introduced -do not adversely-affect 'its the designer's latst effort; acceptancetests-are overall performance. 'However, since judgment performed to evaluate the final design and are governs the type of tests-selected and the number often called approval tests-or evaluation tests. of samples chosen, final acceptance tests must Development tests seek an answer;-while accept- confirm the fact that the fuze does perform as ance tests .confirm it. The tests are.similar, yet specified. theydiffer in threerespects:

4 (1) Development tests are-applied to indivi- 15.2.2 TEST PROGRAMMING' dual components, to modifiedfuzes or to the en- tire fuze; acceptance tests a-e aiplied to the en- Before any tests are made, a test program 'tire fuze only. Armodified fuze-or-a- test model should be set up to include appropriate tests'for ;15:1 I