U.S. Army Material Command (AMC) AMCP 706-210 — FUZES - Engineering Design Handbook AMCP 706-210 (U.S. Army) PDF Download

Downloaded from https://www.everyspec.com AMCP-706-210, each component and fOr the entire fuze. Each detents, springs), and, (3) power sources that, progKam should b6 adapt to the particular provide, theenergy needed to initiate the first ex- fu ze being d6signed. A mple program ofsafety plosive element. The-tests described -below are and uveillainceAs'shown in Table 15-1. It is rec- concerned With performance and simulate actual rbimiended that schedules of this sort be set, at, gonditions satisfactorily., t e~strof'a 0 dev0Pment progii. Such plan- ning -- ilf :avoid -wating fues ihiovertestingand' 15-2.3.1 Exposive Eiements * eil prm it sequertialm esting when desied.

FOr any particular fuze design, some of thesetests- since fuzes must furiction, explsive compo- may be omitted while other more approprite nents are the:key parts They are tested singly or ones-may.,be added: It is fiportafit,thatthe sam- in combination' with other-elements of-the train. pie size be-sufficiently larie that the conclusions Component tests are-normally-dividedinto-three arevalid (see par. 15-6). parts-input, output, and train continuity-wheie The, order Of tests. mustbe considered;.care- the'last one is reallya combinationofthe-other fully. Somieiimes,the orderione of'mere con two.

venience; at-other times, a definite order is-essen- For-stab andpercussion detonators and prim- tiA. Generally-prior to firing teits,-a particulai ers; input is-simulated by dropping onto thdfir- fuze, design should' be subjected to a variety of ingpin a ball of a known-weight from a measured ribughhaiidling tests to fisure that it is-safelihile height. Flash detonators and'other flash initiated Sbeipg handled by proving groundrpersonnel. It is components are set off with a standard primer of -most desirable tozperform sequential tests where. the particular train.

-Electric detonators are ini- the same fuze is subjected first'to one test,then tiated from test sets, that simulate the charac- to another. In this way,-cumulative effects-may teristics-such as voltage, current, capacity,and be-evaluated.. It is necessa to have extra fuzes-r duation-of the planned power source. 15 is a, tyical quantity- for -comparison pur- There are several explosive output tests but as ,poses. These, are inserted as controls at various yet there is no definite agreement as to Which stages in the sequential test. test most aptly indicates the ability of a comp0- -nent to transmit detonation -to the next- com- TABLE 15-1. SAFETY AND SURVEILLANCE TESTS ponent .

While absolute results of these, tests may be in doubt, they are a good yadstick for MIL-S2D)-331 Typical q-uality assurahce-and for measuring'the effect of Tist Test No. Quantity mi-or changes. In the sandbomb test, the deto- - natoi is set 7off Jn a prescribed fixture where it -Jolt 'u01 6" crshes sand of i specified:grade. The AMount of- Jumble 102 6 ,sand crushed is a measure-of output (see par. -Five-foot-drop ill 10 4-2.3).

-In the iead disktest (MIL-STD-331, Test Forty-foot drop 103 10 302), the detonator is placed on top of a speci- Transportation vibraton 104 10 fied disk (usually Grade B lead sheet,.0.1345in; Temperature and-humidity 105 5 Vacuum--steam pressure 106 thick and 1/4 in: diameter). The size of the hole- Waterproofness - 108 5 blown through the disk-is a measure of output. 'Salt spray 107 2 In the steeldent test (MIL-STD-331, Test 301), the detonator is placed Within a prescribed sleeve * Sequential in 3 positiois on top of-a specified size steel block. The depth , - - -of the dent is a measure of output. Depths range from 0.005 to 0.100 in.

15-2.3 COMPONENT TE$TS The explosive train continuity test determines whethereach component in the train wilbe ini- The performance of most'components is tested tiated ,and whethe the final detonation will be by-means other thi -firing, although firing tosts sufficieht forlits purpose. During 'this test, the are -used occasionally. In addition to housing components may be assembled in-line (the-armed } parts, components may -be ,divided into three position) in either a fuze or a test fixture.

In cases groups; (1) explosive elements, (2)-,mechanicai where different triggering actions (impact, time, devices that must be displaced (rotors, sliders, graze) set off separate trains, each train must be 154