U.S. Army Material Command (AMC) AMCP 706-210 — FUZES - Engineering Design Handbook AMCP 706-210 (U.S. Army) PDF Download

Downloaded from https://www.everyspec.com - - '' ~ ',;.-. K>. AM CP 7W210 tests are' nondestructive,, tehe fuies niust-be 'K V] 'both sife and- o-J-beafe th-T-t -The- i lt spray (fog) test(MIL SID331,,lest 107) 'is, used to ascertain-the extent-to-which theBjc '0C1MV 70 1 -65 'fuze is--Waterpo and orsI reIsistant. The 1~00 - - 160 test congists 6,f exposing bare fu'tzes to a bait spray ~ * atmo~sphere-- contintv ou'sly for -48 hoursjto check ~ " __ 'o biiit 4 f-d6,06, * hours to check saifety.,Ihe ~ Cj 'fuzes must be safe~following the 964hourt tst but.

0 A boh ,safii ahd operable 'following 'th6 '48-hotir test., Many, times, inidividual components are~re- - quired to be able topass a similar ftss'as a 'quality, .L . I control chkok on their protectivec6oatings. 0 2 5 0 75 100 125, Io 175 200 A schematic 14ayqut -of 'the test, chaffibernd -TIME, Folomes. the~oiientati6nwof thd,fuzesto bedtested is shown- Figure ,15-12. Cooling 6nd Heating, Curv as of 'in Fig. 1'541. Fuzes Subjected'to'the 'Temp'erature The starxdard temperature arwid ihumidity' test and HiiiyTs -(MIL-STD-331, 'Test 105) i's considered lo beHcmdt'Tt best for use, during develbphient of' fuzes. The, of fuzes to -withstand prolo~ged storage.

at ex-, test involves exposing'bare fuzes to two identical treme temperatures. The,. test-consists of-placing, 14-day 'cycles' for a total of 28, cdays. During the fuzes in a 'temperature chamber 'at -650 F these periqds, )fuzds are heated to '160 F .anrd, for 28 days, followed 'by expo'sui'eat 160 0 'ior then ' cooled .to -450 F nine times. A, relative an additional 28 days. humidity o-f 95 percent atthe high temperatures The vacuum -steam -pressure test' (Mi!L-STD- Js~used to acelerate the dain~e, StAtic and-oper- 331, Test 106) simulates tropical climates.

It is ational, tests under field, conditions are used, to 'especially important for ~fuzes that contain elec- determine whether the fuze withstood the test. trical components. The 'testhas been found to, be' Fig.15-2 sowsaverage heating and cooling the~equivalent of abu ight months storageiji characteristics of fuzes'suhject~d, tO 'the'-tempera- the- Pacific. Each sample fuze is exposed to 100 ture and humidity test cyple., consecutive, 15-minute cycles in a vacuium-steam- The-extreme temperature storage test (MIL- pressure eliamb~r. Fig.

15-13 shows a typical STD-331,_Test 112), is used'to-check the ability' 'installation., AXES- 9F ALL FUZES ARE IN THE PLANE PAIlALLEL TO LONG 'SIDES, OF CNAMBEW Lil SPRAY NOZZLES '3'N3SE DOWN, AXIS 15P ,NOS UPXISBELOW HORIZONTAL 15 ROM vERTICAL 0 ' NOZZLES -AIR SUPIY NOSE OOWN.AXIS 150 ROM VERTICAL NOSE UP. AXIS 1-.1 FOG ~ m4IABOVE HORIZONTAL COLLECTORA IIIISALT SATURATOR ~...,.~j SOLUTION Figure 15-11. Layout of Salt Spray (Fog) Chamber 15-11