Chapter 7: Maintenance 7.3 Hornet 565 Robot User's Guide, 14608-000 Rev C Page 102 of 156 NOTE: The frequency of these procedures depends on the particular system, its operating environment, and amount of usage. Use the frequencies in the tables as guidelines and modify the schedule as needed. NOTE: These lists are not necessarily complete. Table 7-4. Suggested Part Replacement Schedule Item Suggested Interval Estimated Time of Maintenance Description Theta Drive Bushings 1 Year or 5,000 hours 30 Minutes Drive shaft bushings are a normal wear item. A bushing replacement kit is available as p/n 15005- 000.
Backup Encoder Battery Pack 5 years to 10 years 15 Minutes Replacement battery pack is inserted from the side of the robot through the Status Display opening. See Maintenance on page 99 ecking Labels NOTE: Labels giving instructions for lifting or installing are not covered. They may be removed by the user, and do not need to be checked. All labels on the Hornet robot should be checked on a weekly basis for being present and legible. If any of the labels are missing or illegible, they should be replaced. The labels, with part numbers, are listed here: