omron · 16 стр.
LVS-7510 Integrated System Quick Start Guide for Zebra Printers (EN)
Оригинальное название: LVS-7510 Integrated System Quick Start Guide for Zebra Printers
Похожие инструкции
Текст документа
LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers Copyright ©201 9 Omron Microscan Systems, Inc. Tel: +1.425.226.5700 / 800.762.1149 Fax: +1.425.226.8250 All rights reserved. The information contained herein is proprietary and is provided solely for the purpose of allowing customers to operate and/or service Omron Microscan-manufactured equipment and is not to be released, reproduced, or used for any other purpose without written permission of Omron Microscan. Throughout this manual, trademarked names might be used. We state herein that we are using the names to the benefit of the trademark owner, with no intention of infringement.
GS1 Solution Partner Disclaimer The information and specifications described in this manual are subject to change without notice. Latest Manual Version For the latest version of this manual, see the Download Center on our web site at: www.microscan.com . Technical Support For technical support, e-mail: Americas_support@microscan.com EMEA_support@microscan.com APAC_support@microscan.com China_support@microscan.com Warranty For current warranty information, see: www.microscan.com/warranty . Omron Microscan Systems, Inc.
United States Corporate Headquarters +1.425.226.5700 / 800.762.1149 United States Northeast Technology Center +1.603.598.8400 / 800.468.9503 European Headquarters +31.172.423360 Asia Pacific Headquarters +65.6846.1214 LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers Page 2 of 16
LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers Table of Contents Safety Instructions ......................................................................................................................... 4 Important Information .................................................................................................................... 4 Step 1: Inspect System Components ........................................................................................... 5 Step 2: Connect the Cables........................................................................................................... 6 Step 3:
Install and Mount the Light Tower ................................................................................... 9 Step 4: Printer / Media Setup ...................................................................................................... 15 Step 5: Log On to LVS-7510 Integrated System Software ....................................................... 15 Appendix A: LVS-7510 Integrated System Preventive Maintenance ...................................... 16 LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers Page 3 of 16
LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers Safety Instructions This unit has been carefully designed to provide years of safe, reliable performance. However, as with all electrical equipment, there are some basic precautions that you should follow to avoid personal injury or damage to the system: Before using the system, carefully read all the installation and operating instructions. Observe all warning instruction labels on the system. To protect your system from overheating, make sure no openings on the system are blocked. Never insert anything into the openings of the system. Do not use the system near water or spill liquid into it.
Any equipment using electrical voltages may cause personal injury if improperly handled. Do not attempt to work on the system with the main power lines connected. Ensure that the AC power source matches the ratings listed for the system. If unsure, check with your dealer or local utility provider. Do not place the AC power cord where it can be stepped on. If the AC power cord becomes damaged or frayed, replace it immediately. Avoid looking directly into any system lights. If you need to examine the lights, or look at any component near the lights, be sure to first turn off the lights. If the lights cannot be turned off, then wear polarized sunglasses while examining the lights.
To avoid damaging the system, turn off and unplug the system before cleaning. If the system ever needs repair, consult Omron Microscan or your Omron Microscan Distributor. Important Information Due to continual product improvements, the product you receive may differ from the content outlined in this guide.
If you have questions about your product that are not covered in this guide, please contact your Omron Microscan representative or Omron Microscan headquarters at +1-800-762-1149 or Americas_support@microscan.com EMEA_support@microscan.com APAC_support@microscan.com China_support@microscan.com The LVS-7510 Integrated System arrives to your site packaged in specially designed shipping cartons. Do not discard the shipping cartons in case you must ship or store the system for any reason. Failure to use these cartons when returning your product to Omron Microscan will void warranty. The LVS-7510 Integrated System supports Windows 7 Professional and Windows 10.
LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers Page 4 of 16
LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers Step 1: Inspect System Components Open the shipping boxes containing the LVS-7510 Integrated System and carefully remove the contents. Verify the items listed below are included with your system and that each item is clean and in proper condition. Contact your Omron Microscan representative if any items are missing or damaged in transit. Calibrated Conformance Standard Test Card (NIST Traceable) USB cable for LVS-7510 Integrated System readhead (2.0 certified, 6 feet/1.8 m) Power supply (5-volts) AC Line Cord Light Tower Interface Unit Package. Contents include:
o Light Tower Interface Unit o USB Cable o Power Supply (24-volts) LVS-7510 installation flash drive (includes LVS-7510 Integrated System software and “LVS-7510 Integrated System Operations Manual”) “LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers” (this document) WARNING: The LVS-7510 Integrated System is packaged with two power supplies with different voltages (5-volt and 24-volt). The 5-volt power supply connects to the LVS-7510 readhead and the 24-volt power supply connects to the light tower. Take special care when plugging in each power supply as using the wrong power supply results in system failure.
The customer is responsible for providing the following: Thermal labels Light tower mounting solution After system inspection is complete, continue to Step 2: Connect the Cables . LVS-7510 Integrated System Installation and Quick Start Guide for Zebra Printers Page 5 of 16