Downloaded from https://www.everyspec.com MIL-STD-1311D METHOD 2210 GRID RECOVERY 1. Purpose. To measure the ability of the front-end tube in a receiver to recover after an exceptionally large input signal. 2. Equipment. a. A pulse generator capable of applying a specified pulse to the grid of the TUT. b. An oscilloscope capable of measuring the current undershoot ib compared to the average current that exists between pulses. c. A meter for measuring the average anode current. NOTE: The average current during pulsing and the steady state between pulses can be considered equal owing to the low- duty factor of the pulse. 3. Procedure.
The tube shall operate at the test voltage given under conditions with 10,000 ohms in the anode supply and with grid voltage adjusted for the initial quiescent level of anode current prior to pulsing as specified on the TSS. Apply to the grid, pulses of 20 µ s duration at a prr of 60 with pulse amplitude as specified on the TSS. Pulsing at this frequency may continue until a stabilized reading is obtained. The ib is a measure of the peak undershoot and Ib is defined as the change in average current during pulsing as compared to the initial quiescent level. FIGURE 2210-1. Grid pulse characteristics-recovery. METHOD 2210 2210-1 18 August 1970