Department of Defense MIL-STD-1311D — MIL-STD-1311D Test Methods for Electron Tubes — DoD Standard Manual PDF

Downloaded from https://www.everyspec.com MIL-STD-1311D OPERATION OF VACUUM MODULATORS The electrical potentials specified on the TSS shall be applied to the tube. Negative-grid voltage shall be applied to cut off the anode current. The cathode shall be preheated for the specified warm-up time before grid pulse is applied. The duration of the test, excluding preheating, shall be as specified. The grid pulse (in time duration, excluding time of rise and time of fall) shall be as specified. There shall be no evidence of arcing during the last half of this test. METHOD 3269 METHOD 3269 3269-1 19 April 1968