Department of Defense MIL-STD-1311D — MIL-STD-1311D Test Methods for Electron Tubes — DoD Standard Manual PDF

Downloaded from https://www.everyspec.com MIL-STD-1311D METHOD 3268B (Hydrogen modulators) 1. Energy diverter operation. In the test circuit as shown on figure 3268-1 the anode voltage shall be maintained and the tube triggered as specified. A tube which fires without being triggered is a failure. A tube which does not fire when triggered is also a failure. 2. Energy diverter anode delay time. Under the operation test conditions, the energy diverter anode delay time shall not exceed the specified value. The anode delay time shall be measured from the 25 percent point of the unloaded single pulse trigger to the start of the anode current pulse. ENERGY DIVERTER (CROWBAR) OPERATION NOTE: :

Include R V as part of R . FIGURE 3268-1. Basic energy diverter thyratron operation test circuit. METHOD 3268B 3268-1 28 March 1975