Department of Defense MIL-STD-1311D — MIL-STD-1311D Test Methods for Electron Tubes — DoD Standard Manual PDF

Downloaded from https://www.everyspec.com MIL-STD-1311D 3.3 The tube shall be operated under the specified conditions until either: a. The end of the specified life-test period, or b. There is an evident catastrophic failure, or c. It fails to meet one or more of the life-test end points. When load cycling (see 2.3) is specified, it is permissible to disconnect the variable load, and substitute a matched load, in order to test for the power output end point, or other end points normally measured under matched load conditions. 3.4 Time measurement.

The life-test time is the cumulative time during which full inputs are applied (for example, the sum of periods 3.2b for intermittent life test) up to the time determined by either 3.3a, 3.3b, or 3.3c, as appropriate. When the time of failure is known exactly, this time, in completed hours, shall be the life-test time. When the time of failure is not known exactly, the life-test time shall be the lesser of, a. The time up to the midpoint between the last successful reading and the first unsuccessful reading, or b. The time at the last successful reading plus 10 percent of the specified life. 4. Precautions.

Care must be taken, particularly on intermittent life tests, that operating voltages are applied in the correct sequence, and in such manner that no absolute rating of the tube is exceeded even transiently. On intermittent life test, tube cooling means are to be switched with the tube voltages. If the TSS requires that cooling be continued for a specified time after removal of voltages, then delayed shutdown of the cooling means shall be used. METHOD 4551A 4551-2 25 March 1970