Downloaded from https://www.everyspec.com MIL-STD-705C Steady-state voltmeter reading after application of load. Measured minimum peak-to-peak amplitude of the ac voltage trace during the transient pried following load application. (For dc sets use the minimum trace excursion from the zero reference line). Measured amplitude, peak-to-peak for ac of the steady-state voltage after load application. c. Calculate the minimum voltage, in percent, during the transient period after the application of the load by subtracting the voltage dip, in percent, obtained in step b above from 100 percent.
From the oscillograms use the timing lines or the 60 Hertz timing trace and determine the recovery time (no load to load) to the nearest 0.01 second. The recovery time is the time from the application of load until the voltage reaches the stable voltage value as specified in the procurement document. Using the load to no load oscillogram and the corresponding voltmeter d. e. readings determine the voltage rise in percent using the following equation: Voltage Rise, in percent = Where Calculated voltage rise during the transient period R = Measured maximum peak-to-peak amplitude of the ac voltage trace during the transient period following load removal.
(For dc sets use the maximum trace excursion from the zero referece line). Measured amplitude, peak-to-peak for ac, of the steady-state voltage after removing load. Steady-state voltmeter reading after removing load. = Rated voltage for which the generator is connected. Steady-state voltmeter reading prior to removing load. NL = f. Calculate the maximum voltage in percent, during the transient period after removal of load by adding the voltage rise, in percent, obtained in step e above to 100 percent. From the oscillograms, use the timing lines or the 60 Hz timing trace and determine the recovery time (load to no load) to the nearest 0.01 second.
The recovery time is the time from the removal of load until the voltage reaches the stable voltage value as specified in the procurement document. g. h. Compare these results with the requirements of the procurment document. 619.2.5 Procurement document requirements. The following items must be specified in the individual procurement document: Method 619.2c 3