omron — 2-1-2 Installation onto the Operation Panel

2 Installing the NB Unit and Connecting Peripheral Devices 2-1-2 Installation onto the Operation Panel Install the NB Unit by embedding it into the operation panel. 2-1 Installing the NB Unit Use the panel mounting brackets and Phillips screwdriver for installation. Proceed the installation following the procedures below. 1 Panel cutout with dimensions is shown below. Fit the NB Unit into the panel from the front side. Width Opening dimensions Height 2-1-2 Installation onto the Operation Panel 2 As follows, insert the panel mounting brackets at the locations indicated by red box around the back of the NB Unit.

Insert the hooks of positioners into the square holes on the Unit to hold the fixators properly, and tighten the screws firmly with the screwdriver.  NB5Q/NB7W-TW  B NB-series Programmable Terminals Setup Manual(V107) 2-3 2 Models Opening Dimension (WH mm) NB3Q-TW00B/TW01B 119.0(+0.5/-0)93.0(+0.5/-0) NB5Q-TW00B/TW01B 172.4(+0.5/-0)131.0(+0.5/-0) NB7W-TW00B/TW01B 191.0(+0.5/-0)137.0(+0.5/-0) NB10W-TW01B 258.0(+0.5/-0)200.0(+0.5/-0)