Victron Nucleo GX — 11.10. Solar & Wind Priority

Nucleo GX Manual 11.10. Solar & Wind Priority The solar and wind priority function ensures that solar and wind energy are used to charge the battery. At the same time, shore power is only used to prevent the battery from becoming too deeply discharged. When activated, the system remains in this mode, called Sustain, for seven days; if there is not enough sun or wind, a full charge cycle will take place, charging the batteries to 100%. This ensures they remain in optimal condition and are ready for later use. After these seven days, the system will not return to sustain mode.

Instead, it will keep the batteries fully charged and prioritise solar power over shore power wherever possible during the day to run DC loads such as pumps and alarm systems. For details and configuration, please see the Solar & Wind Priority manual . Page 104 VE.Bus Inverter/charger monitoring 1. Go to Settings → Devices → [Your Multi or Quattro] → Advanced → Backup _ _ _ & Restore. 2. Tap Restore and select the backup file to use. 3. Tap Press to restore to start the process. If the VE.Bus device has password-protected settings (e.g. grid code settings), a password entry prompt will appear during the restore process. Enter the required password to complete the restore. 4.

After completion, the configuration is restored and active. The system resumes normal operation, and a notification is displayed.