omron — 4-2 Basic Startup Procedures

4 Implementation Example of Dynamic Pick-and-place Equipment 4-14 NJ-series Robot Integrated System Startup Guide (O049) No. Procedure Description Reference 21 Operation Check on the Actual System Communication set- tings Configure the communication set- tings for connecting Sysmac Studio on the computer and the devices. page 4-103 22 Going online Connect Sysmac Studio online with the Robot Integrated CPU Unit. page 4-110 23 Transferring settings and programs Download the programs and settings in the Sysmac Studio project file to the Robot Integrated CPU Unit and the IPC Application Controller. page 4-111 24 Camera settings Set the properties of the camera.

page 4-115 25 Running the sequence control program and V+ program Run the sequence control program and V+ programs. 4-5-5 Running a Sequence Con- trol Program and V+ Pro- gram on page 4-126 26 Turning robot high pow- er ON Turn ON the robot high power. Turning Robot High Power ON on page 3-96 27 Calibrating the belt Perform belt calibration. 4-5-7 Calibrat- ing the Belt on page 4-130 28 Sensor calibrations Calibrate the sensor. 4-5-8 Calibrat- ing the Sensor on page 4-135 29 Setting the Locator Set the Locator. 4-5-9 Setting the Locator on page 4-146 30 Teaching idle, pick, and place positions (On ac- tual equipment) Operate the robot actually to check and correct teaching data.

page 4-151 31 Running the programs (On actual equipment) Check the operation of the system before starting the automatic opera- tion. page 4-154