Mitsubishi — 8.3.2 Design Example Program

8 Application Examples Ladder diagram for trigger condition 3: Operations: M1002 Set up the bias speed of X axis (V BIAS ) Set up the acceleration time of X axis (T ACC ) Set up the deceleration time of X axis (T DEC ) Clear the current position of X axis as 0 Set up the total distance of all segments for X axis Set up the operation speed for the 1 st segment on X axis X7 X7 = ON, enable single speed positioning mode on X axis and T0 executes, preparing for switching to the 2 nd segment. T0 T0 = ON, modify the operation speed into 20,000Hz and T1 executes, preparing for switching to the 3 rd segment.

T1 T1 = ON, modify the operation speed into 9,000Hz and T2 executes, preparing for switching to the 4 th segment. T2 T2 = ON, modify the operation speed into 18,000Hz and T3 executes, preparing for switching to the 5 th segment. T3 T3 = ON, modify the operation speed into 7,000Hz. Pulse output will be finished in this segment. DVP-PM Application Manual 8-13 MOV K100 D1824 MOV K100 D1836 MOV K100 D1837 DMOV K0 D1848 DMOV K100000 D1838 DMOV K10000 D1840 MOVP H102 D1846 TMR T0 K100 DMOVP K20000 D1840 TMR T1 K100 DMOVP K9000 D1840 TMR T2 K100 DMOVP K18000 D1840 TMR T3 K100 DMOVP K7000 D1840