SC523 Chassis Manual Chapter 6: Rack Installation Rack Precautions Ensure that the leveling jacks on the bottom of the rack are fully extended to the floor with the full weight of the rack resting on them. Rack Mounting Considerations Ambient Operating Temperature In single rack installation, stabilizers should be attached to the rack. If installed in a closed or multi-unit rack assembly, the ambient operating tempera- ture of the rack environment may be greater than the ambient temperature of the room. Therefore, consideration should be given to installing the equipment in an environment compatible with the manufacturer’s maximum rated ambient tempera- ture (TMRA).
In multiple rack installations, the racks should be coupled together. Always make sure the rack is stable before extending a component from the rack. You should extend only one component at a time - extending two or more si- multaneously may cause the rack to become unstable. Equipment should be mounted into a rack so that the amount of airflow required for safe operation is not compromised. Reduced Airflow General Server Precautions Mechanical Loading Review the electrical and general safety precautions that came with the com- ponents you are adding to your chassis. Equipment should be mounted into a rack so that a hazardous condition does not arise due to uneven mechanical loading.
Determine the placement of each component in the rack before you install the rails. Circuit Overloading Install the heaviest server components on the bottom of the rack first, and then work up. Consideration should be given to the connection of the equipment to the power supply circuitry and the effect that any possible overloading of circuits might have on overcurrent protection and power supply wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing this concern. Use a regulating uninterruptible power supply (UPS) to protect the server from power surges, voltage spikes and to keep your system operating in case of a power failure.
Reliable Ground A reliable ground must be maintained at all times. To ensure this, the rack itself should be grounded. Particular attention should be given to power supply connec- tions other than the direct connections to the branch circuit (i.e. the use of power strips, etc.). This unit should be mounted at the bottom of the rack if it is the only unit in the rack. Allow the hot-swappable hard drives and power supply modules to cool before touching them. Always keep the rack's front door and all panels and components on the servers closed when not servicing to maintain proper cooling.
When mounting this unit in a partially filled rack, load the rack from the bottom to the top with the heaviest component at the bottom of the rack. If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the unit in the rack. To prevent bodily injury when mounting or servicing this unit in a rack, you must take special precautions to ensure that the system remains stable. The following guidelines are provided to ensure your safety: 6-2 6-3