SC836 Chassis Manual E-5 JBOD Power Up/Power Down Sequences Power Up Sequences First Use or Power Cord Plug-In 1. Plug the power cords into the rear of the power supplies. 2. Wait until blue Information LED starts to blink. 3. Press the power button once.* The CB3 power board will initiate the power up sequence in three seconds. * If the CB3 JBOD control board already has power, the user may power up the chassis without waiting for the Blue UID LED. After Normal Shutdown by IPMI or Power Button Press the power button once. The CB3 JBOD control board will initiate the power up sequence in three seconds.
After a Power Loss The system will power up automatically approximately fifteen seconds after the power returns. Power Down Sequence 1. Hold down the power button. The blue UID LED will begin blinking. Continue to hold the power button. 2. Release power button after blue LED stops blinking and goes dark. 3. The shutdown sequence will begin and shut down the system within ten seconds. E-12