SC846X Chassis Manual 4-5 Installing the Serverboard Installing the I/O Shield The I/O shield holds the serverboard input/output ports in place. It should be included with your serverboard. Install the I/O shield before installing the serverboard. Installing the I/O Shield With the illustrations facing outward, place the shield into the space provided at the rear of the chassis, beneath the exhaust fan. Standoffs Standoffs prevent short circuits by securing space between the serverboard and the chassis surface. Some standoffs are pre-installed, but some serverboards require additional standoffs. The chassis accessory box contains standoffs and mounting screws.
Compare the mounting holes in the serverboard to those in the chassis and add or remove standoffs as needed. Secure the hexagonal standoff, rounded side up, by screwing it into the mounting base of the chassis. Once all standoffs are in place, you are ready to mount the serverboard. M/B standoff 6-32 to 6-32 Figure 4-13. Chassis Standoffs 4-12