СИ20 — 5.3 Pin assignment

CAUTION Before applying power to the Device, check that the supply voltage and its level are correct. 2. Connect primary transducers to the Device inputs. 3. Connect actuators to the Device outputs. 4. Apply power to the Device. 5. Set up the Device. 6. Power off the Device. 5.3 Pin assignment Screw terminals are located on the back wall (panel-mounting) or inside the device (wall-mounting). The terminal block contacts assignment is shown in Figure 5.1 . 20