Downloaded from https://www.everyspec.com HIM513K-683(AT ) The Steering Committee forth by the Executive is the administrator and overseer of the policies Board and acts to enforce them. set all An effective Project Team will collectively have the lnxwledge necet3saryabout the specif~c product or process in order to implement SPC. The Project Teams mrmally have manbers who will benefit from the project’s success. Team members should include representatives fmm the fOllowing: 4.6.3 ~ *- . a. Ihign Engineering . b. Quality Engineering c. Manufacturing Engineering d- Quality Control e. Production f.
Test Engineering The Project Teams are guided by a Team Leader who is selected by the Steering Committee. The responsibility of the Project Team is to execute the implementation of the SPC process as asaigned by the Team Leader. 4.6-3-1 . The spcific roles and responsibilities of the Project Teams are as follows: a- Perform each step of the systematic SPC process b. Identify obstacles to progress c. Develop recove~ plans to overcome obstacles d. Communicate constraints to the Steering Committee (1) The actual constraint (2) Actions taken (3) Recommendations e. Identify and present potential projects to the Steering (lxmnittee f.
Maintain files on each approved step g- Attend weekly meetings to review progress and coordinate future actions The Project Team authority, power is the ultimate unit in the organization structure having and influence over the project. 8 27