Downloaded from https://www.everyspec.com MIHIDOK-t383(AT) This example is intended to demonstrate the wncept that failure modes and causes may be ranked by the risk priority number and addressed in or&r of significance. 4.6 ~ . The impleiaentation of SPC requires a cultural change. The first action required in order to achieve the necessary cultume change is to establish the organizational structure which will provide the foundation, direction and support for SEW proceae -l~tition- Change ~gi~ at the top and it will naturally cascade down to every level of the corporate structure. The organizational structure described is not intended to replace the existing structure of the ~.
It shall function as an integral complimentary framework having the ~se and objective of irqplementingSPC through a systematic process. the main elements of the structure should include the followhg: a. President-s Quality Council b. Steering Committee c. Project Teams d. Team Leaders e. Team f. Facilitators 4.6.1 ~OS aua,litv~ , . The Executive Board is the highest authority within the structure. Its members are primarily vice presidents whose operations have a direct influence on the costs of quality relating to prevention, appraisal end internal and external failure.
Typically these members come from the functions of product development, design engineering, manufacturing, finance, quality control and customer service. The President-s Quality Council is chaired by an individualwhose position holds the responsibility and influential control over a m~ority of the board-a resources. This individual will also have the most to gain from succee6 of the program. Typical positions that carry such responsibility and influence include the President, Executive Vice President and Vice President of Operations.
4.6.2 Steering Committees report to the Rxecutive Board and are composed of indi~iduals who have the responsibility to direct and support the activities of the individual teams implementing SPC. Members of Steering Cmmittees primarily consist of middle managers who are directly responsible for, or support the proceesee being addressed. Typical Manufacturing Steering Committee membersare Quality ~ineeri~ -er~ Manufacturing Engineering Manager, Design Engineering Manager and a Finance _er. The chairman and leader of this committee, when adtiessti production processes, is most frequently the Plant Manager, Manufacturing _er, or General Manager.
This individual usually has the most to gain from the results of SPC and is the one who typically manages most of the resources required to implement such a program. 26