Downloaded from https://www.everyspec.com - A b- response should be a mnthly written report from the supplier which shows progress on the actions defined- If the corrective uti- extend over eaveral mnths, a quarterly or monthly meeting between both partiea should be scheduled to review prmgreas and to repeat the audit on critical elemnta. t’lIL-HDBK-663(AT) 5.8 . The audit report should be used to adjust the contmot final inspection requirements for *ts delivered. If the plant tour proves that SXhae been established for specific parameters and the supplier provides control charta for those parameter with each shi~t, there is an O~rtUdtY to ~ Or eli-ina- in8peotion for thorn ~amters.
If oertain pammetera require CXmWctive actions to demonstrate complete kplementat ion, then these paramtere oan be more cloeely eorutinized during final inspection or W* contractor W- ins-t ion. Thi8 will allow the available receiving inspection e~ to be channeled into the most productive areas. As the supplier”a corrective action pmgr= proceeds, receivi~ inspection controls may be relaxed based on the evidenoe available.
The ultimate objective is to eliminate receiving inspection entirely and rely on periodic audits of the supplier SPC system to retain conftdenoe in the product- Usage data from higher level assembly inspections and tests should be integrated into the supplier feedback loop during follow-up meetings scheduled at least quarterly. These meetings should be continued as part of the ~haaing program even after all corrective action programs have been completed. . 64