SBB 937R-E2JB User's Manual 2-6 Checking the Drive Bay Setup Next, you should check to make sure the peripheral drives and the SAS drives have been properly installed and all connections have been made. Checking the Drives The hard drives can be installed and removed from the front of the chassis 1. without removing the top chassis cover. Depending upon your system's confi guration, your system may have one or 2. more drives already installed. If you need to install hard drives, please refer to Chapter 5. Checking the Airfl ow Airfl ow is provided by 4-cm counter-rotating fans. The system component 1.
layout was carefully designed to direct suffi cient cooling airfl ow to the compo- nents that generate the most heat. See Chapter 5 for details. Note that all power and data cables have been routed in such a way that they 2. do not block the airfl ow generated by the fans. Providing Power Plug the power cord(s) from the power supply unit(s) into a high-quality power 1. strip that offers protection from electrical noise and power surges. It is recom- mended that you use an uninterruptible power supply (UPS). Depress the power on button on the front of the chassis. 2. 2-8