Chapter 2: Server Installation Installing the Chassis into a Rack (Figure 2-6) Standard Chassis Installation 1. Confi rm that the inner rails are properly installed on the chassis. 2. Confi rm that the outer rails are correctly installed on the rack. 3. Pull the middle rail out from the front of the outer rail and make sure that the ball-bearing shuttle is at the front locking position of the middle rail. 4. Align the chassis inner rails with the front of the middle rails. 5.
Slide the inner rails on the chassis into the middle rails, keeping the pressure even on both sides, until the locking tab of the inner rail clicks into the front of the middle rail, locking the chassis into the fully extended position. 6. Depress the locking tabs of both sides at the same time and push the chassis all the way into the rear of the rack. 7. If necessary for security purposes, use screws to secure the chassis handles to the front of the rack. Note: The fi gure below is for illustration purposes only. Always install servers to the bottom of the rack fi rst. Figure 2-6. Installing into a Rack Ball-Bearing Shuttle 2-9